Modeling and Solving Scheduling Problems with CP Optimizer

The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical problem among the myriad scheduling problems studied both in academia and in industry. Philippe Laborie, a principal scientist at IBM, describes how it can easily be modeled and efficiently solved using the CP Optimizer engine of IBM ILOG CPLEX Optimization Studio. Link

This entry was posted in Decision Optimization, Scheduling and Resource Allocation. Bookmark the permalink.

Leave a comment